UTILIZATION OF BIM (BUILDING INFORMATION MODELING) TECHNOLOGY TO INCREASE EFFICIENCY AND ACCURACY OF INFRASTRUCTURE PROJECT PLANNING

Authors

  • Ilwandri Akademi Teknik Adikarya
  • Tomi Apra Santosa Akademi Teknik Adikarya
  • Dika Sulmadianti Akademi Teknik Adikarya
  • Arya Ningsih Akademi Teknik Adikarya
  • Insira Insani Fitri Akademi Teknik Adikarya
  • Alex Irawan Trianto Akademi Teknik Adikarya
  • Muhammad Fachri Said Universitas Muslim Indonesia

DOI:

https://doi.org/10.61991/inovasisosial.v1i1.21

Keywords:

Building Information Modeling (BIM); Project Information Management System (PMIS); Construction Technology Innovation; 3D Model

Abstract

This research aims to investigate the use of BIM (Building Information Modeling) Technology as an innovative solution in increasing the efficiency and accuracy of infrastructure project planning. The research method consists of identifying stakeholder needs, developing an integrated 3D BIM model, validating and testing the model, integration into the Project Information Management System (PMIS), as well as training and application in the field. By adopting this approach, it is hoped that it will be able to improve the quality of planning information, provide a holistic view of the project, and optimize collaboration between stakeholders. This research focuses not only on the technical aspects of BIM models, but also on their practical implementation in real construction environments. The results of this research are expected to make a significant contribution to increasing the effectiveness of infrastructure project management through the use of BIM technology.

Downloads

Download data is not yet available.

References

Azhar, S., Khalfan, M., &; Maqsood, T. (2012). Building information modelling (BIM): now and beyond. Australasian Journal of Construction Economics and Building, 12(4), 15-28.

Lee, A., Wu, S., Marshall-Ponting, A. J., Aouad, G., Cooper, R., Tah, J. H. M., ... & Fu, C. (2015). nD modelling–a driver or enabler for construction improvement?. RICS COBRA AUBEA 2015.

Lu, W., Fung, A., Peng, Y., Liang, C., & Rowlinson, S. (2015). Demystifying construction project time-effort distribution curves: BIM and non-BIM comparison. Journal of Management in Engineering, 31(6), 04015010.

Wong, K. A., Wong, K. F., &; Nadeem, A. (2011). Building information modelling for tertiary construction education in Hong Kong. Journal of information technology in construction, 16, 467-476.

Wu, W., & Issa, R. R. (2014). BIM education and recruiting: Survey-based comparative analysis of issues, perceptions, and collaboration opportunities. Journal of Professional Issues in Engineering Education and Practice, 140(2).

Downloads

Published

2023-10-01 — Updated on 2024-12-24

Versions

How to Cite

Ilwandri, Tomi Apra Santosa, Dika Sulmadianti, Arya Ningsih, Insira Insani Fitri, Alex Irawan Trianto, & Muhammad Fachri Said. (2024). UTILIZATION OF BIM (BUILDING INFORMATION MODELING) TECHNOLOGY TO INCREASE EFFICIENCY AND ACCURACY OF INFRASTRUCTURE PROJECT PLANNING . Inovasi Sosial : Jurnal Pengabdian Kepada Masyarakat, 2(2), 1–4. https://doi.org/10.61991/inovasisosial.v1i1.21 (Original work published October 1, 2023)

Issue

Section

Articles